I continue to struggle with dedicating the time to documenting but continue pressing forward with accomplishments on a monthly, weekly, and daily basis. Last weekend I was able to wrap up this trim out of the low voltage wiring in the shop and prepare it to be covered with insulation.
I’ll also go ahead and fill in the insulation in the wall cavities to the bottom left (hopefully tomorrow) and basically finalize this back wall being ready for drywall… or potentially just sheets of plywood. I’ve been considering the plywood approach for a while and simply screwing in the sheets and leaving the fasteners exposed so that I could remove panels, to allow easy access if needed in the future. The only thing prohibiting this approach at this point is the current cost of plywood which is still substantially higher than it was pre-covid.
Aside from the shop progress, I was able to record 4 videos this week and got them edited and uploaded to my YouTube channel last night. Progress, progress, progress… one day at a time!
https://marvinpeardon.com/wp-content/uploads/2022/05/MarvinPeardon.com-Logo-Website.jpg00mpeardonhttps://marvinpeardon.com/wp-content/uploads/2022/05/MarvinPeardon.com-Logo-Website.jpgmpeardon2022-10-01 22:06:152024-07-04 02:25:34Shop Progress | Low Voltage
0replies
Leave a Reply
Want to join the discussion? Feel free to contribute!
Leave a Reply
Want to join the discussion?Feel free to contribute!